Business

Fauji Fertilizer Resumes Production at Goth Macchi Plant-I

Fauji Fertilizer Company Limited (FFC) has resumed production at its Goth Machhi Plant-I after five days.

The company’s Plant-I Goth Machhi was temporarily shut down on November 12, 2022, due to a technical fault.

The troubleshooting/maintenance of Plant-I lasted five days. As per protocol, production on the 695,000-ton unit was paused during that period.

Ad Powered By Advergic
Loading ad . . .
Ad - Continue scrolling to read

At the time of filing this report, the company’s scrip at the bourse was trading at Rs. 102.5, up Rs. 0.12 or 0.12 percent with a turnover of 734,782 shares on Thursday.

Share
Published by
ProPK Staff