Home Latest News Industry Economy & Policy Markets Gold & Money Banking & Fintech Startups Agri-Business

Energy Minister Hits Back At Former Minister For Calling Power Sector Incompetent

Energy Minister Awais Leghari has called out ex-Commerce Minister Dr. Gohar Ejaz over his recent tweet where he called the federal government incompetent and said the “Power Sector is the True Face of its incompetence”.

“Dear former minister. (ill informed) FYI ! 35 years of desperate and ill planning is being sorted out. For the first time, the privatisation effort has been launched aggressively for Discos. Something that was never done earlier,” he said in a tweet on Monday.

He said the government is expecting to complete the first phase of privatization by June 2025. All GENCOs will be privatized within one year, and any stranded assets will be sold off to reduce capacity payments and to reduce government footprint in the power sector.

“We are focused on increasing the indigenous component in the fuel mix, which is currently at greater than 75% local. We continue to make efforts to maximize utilization of local fuel and preserve precious foreign currency in the process,” he added.

All expensive capacity payment RFO-based IPPs will be moved out of the system. “We use little to no RFO for generating power now. Moreover, the capacity cost associated with the same is less than a rupee on a per unit basis,” he stated.

“With IPPs established post 2015 to rid the country of extended load shedding — we continue to have a conversation with them to smoothen out cash flow and enable reduction in electricity price accordingly. We continue to work on removing transmission constraints, and the amount for some of those has already been allocated in PSDP. It is critical to enable efficient utilisation of existing generation capacity,” he concluded.


  • Power sector is the most incompetent sector of Pakistan; it cannot manage the power generation and it plays in the hands of IPPs that are eating up Pakistan resources, it is very simple now everyone knows what IPPs are doing.

  • Both of them are as incompetent as the whole department is from ages. If you ever want to see how incompetent they are than observe any pole with transformer or poles in local streets.

  • Correct power ministry is a big failure and incompetent people’s needs to removed. Role of nepra is dibious as nepra instead of protecting consumer rights became a party

  • Who’s gonna tell him that for part 35 years it was his own govt that created the mess .


  • Get Alerts

    ProPakistani Community

    Join the groups below to get latest news and updates.



    >