Business

PPL Reports Big Increase in Gas Processing Capacity in Sindh’s Sanghar District

Pakistan Petroleum Limited (PPL) has enhanced gas processing capacity at its Gambat South Gas Processing Facility (GPF-II) in Sanghar, Sindh, from 55 million standard cubic feet per day (MMscfd) to 60 MMscfd through process optimization.

The company, which holds a 65 percent working interest in the Gambat South Block along with joint venture partners Government Holdings (Private) Limited (25%) and Asia Resources Oil Limited (10%), achieved the milestone without any hardware modification.

The capacity boost resulted from optimising the Amine sweetening process by introducing a proprietary additive to the existing MDEA solvent system. The enhancement has added approximately 5 MMscfd of gas, 35 barrels per day of condensate, and one metric ton of LPG.

Ad Powered By Advergic
Loading ad . . .
Ad - Continue scrolling to read

PPL said the development, achieved at minimal cost, underscores its focus on efficiency, innovation, and maximising domestic hydrocarbon output from existing fields in a cost-effective manner.

Share
Published by
Business Desk