Oil & Gas Development Company Limited (OGDCL) on Tuesday announced that the Nashpa-11 well has been successfully tested, completed, and brought into the production stream.
In a notice to the Pakistan Stock Exchange (PSX), the company said that this development is the result of its in-house expertise. The well was drilled to a depth of 4,485 meters, targeting the hydrocarbon potential within the Lumshiwal, Hangu, and Lockhart formations.
“Presently, these formations are yielding 830 BPD of oil and 1.0 MMSCFD of gas through a 32/64″ choke at a wellhead flowing pressure (WHFP) of 520 PSI. As of September 11, 2023, the well has been connected to the OGDCL Nashpa plant through a 1.8 Km flow line, and gas is being injected into the SNGPL network,” it added.
The notice further highlighted that this venture is a collaborative effort where OGDCL stands as the operator, holding a 56.45 percent stake. The partnership also involves Pakistan Petroleum Limited (PPL), which holds a 28.55 percent share, and Government Holding Private Limited (GHPL) with a 15 percent share.
Get the latest business news, market insights, and economic updates wherever you prefer.
Add ProPakistani to Preferred Sources and see more of our stories in Google Search and Top Stories.