Pakistan Telecommunication Authority (PTA) has invited applications from cellular mobile operators for 16 MHz paired spectrum in the 1800 MHz band and 30 MHz paired in the 2100 MHz band for technology-neutral Next Generation Mobile Services (NGMS) in Azad Jammu & Kashmir (AJ&K) and Gilgit-Baltistan (GB).
PTA has issued an Information Memorandum (IM), according to which the auction is scheduled to be held on 13 October 2021. However, sources say that the operators may require more time for consultation, and the auction may be held on 20 October at the latest.
ALSO READ
Taha Aziz Magrabi to Head Utility Stores Corporation
The Spectrum Auction of the NGMS in AJ&K and GB is for use of the spectrum from the internationally harmonized 1800 MHz and 2100 MHz bands within AJ&K and GB. The spectrum included in the Spectrum Auction of the NGMS in AJ&K and GB comprises:
The 2×16 MHz of spectrum will be packaged as two blocks of 2×5 MHz and five blocks of 2×1.2MHz. The 2×30 MHz in the 2100 MHz band will be packaged as six specific blocks of 2×5 MHz:
Each Applicant will be required to state their interest in the following spectrum at the Base Price:
The base price for 2×1 MHz in 1800 MHz and 2100 MHz is $0.87 million. The base price for 1800 MHz – Product 1 2×5 MHz is $4.35 million, 1800 MHz – Product 2 2×1.2 MHz $1.04 million, and 2100 MHz 2×5.0 MHz is $4.35 million.
ALSO READ
T-Bills and PIBs Show Increasing Investor Confidence in Pakistan
S. No. | Process Step | Timeline (T0*/T1 + No. of days) |
1 | Publication of Information Memorandum (IM) | T0 |
2 | The consultation period on the Spectrum Auction rules and procedures as set out in the Information Memorandum | T0 + [21] |
3 | Notification of changes to the Spectrum Auction of NGMS in AJ&K and GB rules and procedures, if any, and publication of any changes to the IM | T0 + [26] |
4 | Information session for prospective Applicants (last opportunity for prospective Applicants to ask questions and get clarification on specifics of the Spectrum Auction) if required | T0 + [30] |
5 | Deadline for prospective Applicants to submit Application Form and Sealed-Bid Form with Pre-Bid Deposits (Annex B and Annex E) | T1 = T0 + [35] (until 4 PM Pakistan Standard Time) |
6 | PTA notifies Qualified Applicant(s) and informs them about whether the Auction shall move to the Electronic Auction Stage, or PTA declares Qualified Applicants as Provisional Winners | T1 + [1] |
7 | If PTA proceeds with the Electronic Auction Stage, an information package containing confidential information and instructions to participate in the Electronic Auction Stage is provided to Qualified Applicants eligible to participate in the stage. | T1 + [2] |
8 | Mock Auction (1800 MHz and 2100 MHz), if required, for eligible Qualified Applicants | T1 + [5] |
9 | Clock Auction bidding starts, if required | T1 + [6] |
10 | SMRA Auction bidding starts, if required, for eligible Qualified Applicants | T1 + [7] |
11 | Provisional Winners announced for both spectrum bands | No more than [1] day after the completion of the Electronic Auction Stage, if required |
12 | Initial Spectrum Fees are due from Provisional Winners for all Spectrum Blocks acquired in the Spectrum Auction (i.e. 50% or 100% payment of the Initial Spectrum Fee). | According to the schedule in Section 2.5 of this IM |
13 | PTA, in consultation with FAB, to issue Rationalization Plan for the 1800MHz band and, if necessary, proposed band plan for 2100 MHz band. | After receipt of all relevant Initial Spectrum Fee |
14 | Deadline for CMOs to implement Rationalisation Plan for the 1800MHz band; | Within 30 days of PTA having published the Rationalisation Plan |
15 | Grant of Licenses/Assignment of right to use of spectrum | After having received 50% or 100% of the Initial Spectrum Fee and implementation of Rationalization Plan |
After having received 50% or 100% of the Initial Spectrum Fee and implementation of Rationalization Plan |